Health and Safety Risk Assessment
This is to show the examiner the dangers that we could encounter when we are filming, and to show that we have prepared ourselves in case any of these things happen.
Production Title: HS2: A White Elephant
|
Production Date: 20/10/17
|
Producer name: Dan James, Tayte Fordham
|
Director Name: Dan James, Tayte Fordham
|
Date of risk assessment: 10/10/2017
|
Risk assessment conducted by: Dan James, Tayte Fordham
|
Hazard
|
Persons who may be harmed
|
Property that may be damaged
|
Risk controls already in place
|
Risk Assessment (Low/Moderate/High)
|
Further action to reduce the risk
|
Being hit by trains/Falling into the train tracks
|
Cameramen
|
Train track, train & camera equipment
|
Yellow line not to pass
|
Moderate
|
Brief cameramen the risks and dangers
|
Being hit by cars
|
Cameramen
|
Car
|
Use the paths
|
Low
|
Brief cameramen the risks and dangers
|
Falling down steps
|
Cameramen
|
Camera Equipment
|
Safe shoes and clearing the steps
|
Low
|
Brief cameramen the risks and dangers
|
Falling into river
|
Cameramen
|
Camera equipment
|
Safe shoes
|
Low
|
Brief cameramen the risks and dangers
|
High up, multi storey car park location
|
Cameramen
|
Camera equipment
|
Be careful when near the edge
|
Moderate
|
Brief cameramen the risks and dangers
|
Busy high street
|
Cameramen
|
Camera equipment
|
Ensure space is made around cameramen
|
Low
|
Brief cameramen the risks and dangers
|
No comments:
Post a Comment